CERCA’S construction process is designed to promote a higher standard of living, while simplifying the assembly process and providing the highest quality results. We use top-of-the-line materials that are both environmentally friendly and sustainable, ensuring a sturdy, reliable, and long lasting finished product.
The quality of a product is defined by every single detail. We use only the best materials and methods to build a product that will last you through the years with pride.
01 Cladding
02 Wooden Furring
03 Tyvek
04 OSB sheet
05 Light Gauge Steel (LGS)
06 Fiberglass insulation
07 Finished Wall
The quality of a high quality product is defined by every single detail. We use only the best materials and methods to build a product that will last you through the years with pride.
01 Bi Fold Door
02 Swing Windows
03 Tilt Windows
04 Sliding Doors
05 Swing Doors
The Cerca process was designed to ensure that our customers experience best in class service. You will be updated at every step of the process and provided with a delivery timeline once your order is placed. We pride ourselves in our level of responsiveness and transparency, which is why every one of our customers is assigned a dedicated account manager to provide follow ups and answer questions.
2+ weeks after initial consultation
Once you have been in contact with our team and secured a reservation package, we will put you in contact with contractors within our network (depending on location) to evaluate your property and provide feedback regarding installation costs.
2-4 weeks
One of our in house designers will be assigned to you where you will be provided with more detail regarding the site plan, elevations, and specific design configurations.
4+ weeks
Our designers will work with structural engineers to prepare a plan set submission for permits based on the design choices you selected.
2-24+ weeks
Once your plan set submission is provided to the City, you will need to wait for your permit to be issued. We advise getting the process started as soon as possible to avoid delays. Our team will be available to serve you throughout the process should any questions or comments come up that need to be addressed.
2-6 weeks
Once you receive your permit, we will start with the production process based on the design and engineering configurations approved by the City. We will provide you with an estimated delivery timeline once we get closer to production completion.
1-2 weeks
You will work directly with your chosen installer to get your unit assembled and complete.
I'd be delighted to learn more about your vision for your CERCA project and provide you with more information about our product and our process.
Want the Lastest Cerca Update?
She is trusted and well respected by her diverse network of associates and colleagues and is known for her effervescent personality, positive attitude, attention to detail, straightforward communication, and willingness to do whatever it takes to get the work done on time and within budget.